{"id":2077,"date":"2025-07-26T13:07:29","date_gmt":"2025-07-26T01:07:29","guid":{"rendered":"https:\/\/www.workstem.com\/au\/blog\/auto-draft\/"},"modified":"2025-08-27T13:20:09","modified_gmt":"2025-08-27T01:20:09","slug":"daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020","status":"publish","type":"post","link":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/","title":{"rendered":"Daily vs Weekly vs Casual Employment in Building and Construction Award (MA000020)"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Selecting the right engagement type is very crucial in the <\/span><b>Building &amp; Construction Award<\/b><span style=\"font-weight: 400;\"> (<\/span><b>MA000020<\/b><span style=\"font-weight: 400;\">). The Award recognises <\/span><b>daily hire<\/b><span style=\"font-weight: 400;\">, <\/span><b>full\u2011time weekly hire<\/b><span style=\"font-weight: 400;\">, <\/span><b>part\u2011time weekly hire<\/b><span style=\"font-weight: 400;\">, and <\/span><b>casual<\/b><span style=\"font-weight: 400;\"> categories\u2014each with different rules for notice, leave, loadings and costing across projects. Ultimately, <\/span><b>only tradespersons and labourers can be engaged as daily hire, and apprentices must be weekly hire (never daily or casual).<\/b><span style=\"font-weight: 400;\"> Misclassification can snowball into leave, allowance and termination underpayments across multi\u2011site builds and labour\u2011hire arrangements. This guide helps employers match roles to the correct classification and pay them correctly.\u00a0\u00a0<\/span><\/p>\n<h2><b>Who Can You Engage in Each Category?\u00a0<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Under <\/span><b>MA000020<\/b><span style=\"font-weight: 400;\">, you may engage employees as daily hire, full\u2011time weekly hire, part\u2011time weekly hire, or casual. <\/span><b>Daily hire is restricted to tradespersons and labourers<\/b><span style=\"font-weight: 400;\">; it\u2019s not available for apprentices. <\/span><b>Apprentices must be employed on a weekly hire basis.<\/b><span style=\"font-weight: 400;\"> Casual engagement is permitted but must meet the statutory definition of casual (no firm advance commitment). Document the category <\/span><span style=\"font-weight: 400;\">i<\/span><span style=\"font-weight: 400;\">n writing<\/span><span style=\"font-weight: 400;\"> at commencement.\u00a0<\/span><\/p>\n<h2><b>Which Type Fits Which Worker?<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td>\n<p style=\"text-align: center;\"><b>Engagement Type<\/b><\/p>\n<\/td>\n<td style=\"text-align: center;\"><b>Who Can You Use It For?<\/b><\/td>\n<td style=\"text-align: center;\"><b>Notice to Terminate<\/b><\/td>\n<td style=\"text-align: center;\"><b>Leave Entitlements<\/b><\/td>\n<td style=\"text-align: center;\"><b>Special Loadings\/Notes<\/b><\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center;\"><b>Daily Hire<\/b><\/p>\n<\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">Only tradespersons &amp; labourers. Not apprentices.<\/span><\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">1 day notice (or 1 day\u2019s pay).<\/span><\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">Annual &amp; personal leave apply (like permanent).<\/span><\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">Includes \u201cfollow the job\u201d loading built into rate.<\/span><\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center;\"><b>Full\u2011Time Weekly Hire<\/b><\/p>\n<\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">Avg 38 hrs\/wk. Includes apprentices.<\/span><\/td>\n<td>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">NES notice periods apply.<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Full leave entitlements.<\/span><\/p>\n<\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">Standard base for most long\u2011term site roles.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\"><b>Part\u2011Time Weekly Hire<\/b><\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">&lt;38 predictable hrs\/wk; agreed in writing (pattern, days, start\/finish).<\/span><\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">According to NES (pro\u2011rata).<\/span><\/td>\n<td style=\"text-align: center;\">\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Pro\u2011rata leave.<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Clarify if RDOs accrue pro\u2011rata.<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\"><b>Casual<\/b><\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">Irregular\/on\u2011call; min engagements apply. No apprentices.<\/span><\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">No notice to end shift; limited ongoing guarantees.<\/span><\/td>\n<td style=\"text-align: center;\"><span style=\"font-weight: 400;\">No paid leave; 25% casual loading in lieu.<\/span><\/td>\n<td>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">Check minimum 4\u2011hr engagement &amp; weekend mins.<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>When Should You Use (or Change) an Engagement Type?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Decide the employment type during onboarding; review regularly. If a \u201ccasual\u201d is rostered in regular, systematic patterns, conversion or reclassification questions arise (and back\u2011pay risk if leave loading was wrong). Daily hire offers flexibility for short projects but still entitled to leave; they can also be terminated with 1 day\u2019s notice.\u00a0<\/span><\/p>\n<h2><b>Where Does MA000020 Apply?<\/b><\/h2>\n<p><b>MA000020<\/b><span style=\"font-weight: 400;\"> covers on\u2011site <\/span><b>general building, civil construction, and metal &amp; engineering construction<\/b><span style=\"font-weight: 400;\"> work nation\u2011wide. It does <\/span><b>not<\/b><span style=\"font-weight: 400;\"> apply where another modern award more specifically covers the work (e.g., Electrical, Plumbing, Manufacturing, Mining, Pre\u2011mixed Concrete). Always check coverage clause and classification descriptors when work crosses industries or when subcontract trades operate under a different award.\u00a0<\/span><\/p>\n<h2><b>Why Getting Classification Right Protects Your Business?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Misclassifying a worker can trigger leave disputes, wrong loadings, and back pay claims across projects. The <\/span><b>Building &amp; Construction Award (MA000020)<\/b><span style=\"font-weight: 400;\"> sets distinct rules for <\/span><b>daily hire<\/b><span style=\"font-weight: 400;\">, <\/span><b>weekly hire<\/b><span style=\"font-weight: 400;\"> (full\u2011time &amp; part\u2011time), and <\/span><b>casual<\/b><span style=\"font-weight: 400;\"> engagements \u2014 and even restricts who can be daily hire.\u00a0<\/span><\/p>\n<h2><b>How Workstem Simplifies Building &amp; Construction Award Compliance<\/b><\/h2>\n<p>Simplify award interpretation and payroll processing with <span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/\">Workstem<\/a><\/span>, the all-in-one <span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/\">workforce management &amp; payroll software<\/a><\/span> designed for every industry. Our system supports 122+ modern awards &amp; 34 EAs, including the Building &amp; Construction Award 2025, and keeps you up-to-date with changes in wage rates, penalty rates, and overtime rules.Workstem offers:<\/p>\n<ul>\n<li>Automated award interpretation<\/li>\n<li>Real-time wage calculations and timesheet syncing<\/li>\n<li>Employee self-service app for rosters and payslips<\/li>\n<li>Seamless integrations with <span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/product\/integrations\/xero\/\">Xero<\/a><\/span>,<span style=\"color: #3366ff;\"> <a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/product\/integrations\/netsuite\/\">NetSuite<\/a><\/span>, and more<\/li>\n<\/ul>\n<p>Choose from our <span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/pricing\/\">Standard or Advanced plan<\/a><\/span> to suit your business needs, and stay Fair Work compliant with confidence.<\/p>\n<p><a href=\"https:\/\/www.workstem.com\/au\/contact\/\"><span style=\"color: #3366ff;\">Book a free demo<\/span><\/a> with our payroll experts and experience how Workstem can streamline your payroll and workforce operations.<\/p>\n<h2><b>FAQs About the Building &amp; Construction Industry Award<\/b><\/h2>\n<p><b>Q1: Who can be hired as a daily hire employee under the Building &amp; Construction Award?<\/b><\/p>\n<p><span style=\"font-weight: 400;\">A1: Only tradespersons and labourers can be engaged as daily hire; other roles (including apprentices) are excluded.<\/span><\/p>\n<p><b>Q2: Can an apprentice be engaged as daily hire or casual?<\/b><\/p>\n<p><b><\/b><span style=\"font-weight: 400;\">A2: No. Apprentices must be employed on a weekly hire basis\u2014not daily hire or casual\u2014under the Building &amp; Construction Award.<\/span><\/p>\n<p><b>Q3: Do daily hire employees get leave and what notice applies?<\/b><\/p>\n<p><b><\/b><span style=\"font-weight: 400;\">A3: Daily hire employees are permanent (leave accrues) and either party can end employment with <\/span><b>1 day\u2019s notice<\/b><span style=\"font-weight: 400;\"> (or pay in lieu); tradespersons also get 1 hour to gather tools at termination.<\/span><a href=\"https:\/\/www.fairwork.gov.au\/starting-employment\/types-of-employees\/daily-hire-and-weekly-hire\"><span style=\"font-weight: 400;\">\u00a0<\/span><\/a><\/p>\n<p><b>Q4: What\u2019s different about weekly hire (full\u2011time or part\u2011time)?<\/b><\/p>\n<p><b><\/b><span style=\"font-weight: 400;\">A4: Weekly hire employees\u2014including apprentices\u2014work an average of 38 hrs (full\u2011time) or agreed part\u2011time hours, receive the full NES leave suite, and require standard notice periods.<\/span><a href=\"https:\/\/www.fairwork.gov.au\/starting-employment\/types-of-employees\/daily-hire-and-weekly-hire\"><span style=\"font-weight: 400;\">\u00a0<\/span><\/a><\/p>\n<p><b>Q5: What is the casual loading (and minimum engagement) I must pay?<\/b><\/p>\n<p><b><\/b><span style=\"font-weight: 400;\">A5: Casuals get a <\/span><b>25% loading<\/b><span style=\"font-weight: 400;\"> in lieu of paid leave\/notice and must be paid for a minimum shift period (commonly 4 hrs\u2014check your sector clause).<\/span><a href=\"https:\/\/www.paycat.com.au\/blog\/building-and-construction-award-ma000020\"><span style=\"font-weight: 400;\">\u00a0<\/span><\/a><\/p>\n<p><b>Q6: When should I review long\u2011term casuals for conversion to permanent?<\/b><\/p>\n<p><b><\/b><span style=\"font-weight: 400;\">A6: If a casual person has worked a regular pattern long enough to meet NES thresholds, they can request (or be offered) conversion to full\u2011time or part\u2011time\u2014review patterns at least every 6\u201312 months (timelines vary by business size).<\/span><\/p>\n<p><em><strong>Read More\uff1a<\/strong><\/em><\/p>\n<p><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/building-construction-award-ma000020-2025-guide\/\">Building &amp; Construction Award [MA000020] 2025: Pay Rates &amp; Rights<\/a><\/span><\/p>\n<p><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/apprentice-wages-building-construction-award-2025\/\">Apprentice Wages in Building &amp; Construction Award 2025<\/a><\/span><\/p>\n<p><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/legally-compliant-rosters-for-building-construction-in-2025\/\">Legally Compliant Rosters for Building &amp; Construction in 2025<\/a><\/span><\/p>\n<p><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/building-construction-general-on-site-award-guide\/\">Building and Construction General On-site Award Guide [MA000020]<\/a><\/span><\/p>\n<p><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/fair-work-penalties-unpaid-wages-construction\/\">How to Avoid Fair Work Penalties for Unpaid Wages in Construction<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Selecting the right engagement type is very crucial in the Building &amp; Construction Award (MA000020). The Award recognises daily hire, full\u2011time weekly hire, part\u2011time weekly hire, and casual categories\u2014each with different rules for notice, leave, loadings and costing across projects. Ultimately, only tradespersons and labourers can be engaged as daily hire, and apprentices must be&#8230;<\/p>\n","protected":false},"author":16,"featured_media":2267,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[40,55,42],"class_list":["post-2077","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-award-interpretation","tag-casual-employment-australia","tag-popular"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Award 2025: Daily vs Weekly vs Casual- Workstem Australia<\/title>\n<meta name=\"description\" content=\"Confused about daily vs weekly vs casual under the Building &amp; Construction Award 2025 (MA000020)? Learn which engagement type fits, avoid costly Fair Work mistakes, and stay compliant.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Award 2025: Daily vs Weekly vs Casual- Workstem Australia\" \/>\n<meta property=\"og:description\" content=\"Confused about daily vs weekly vs casual under the Building &amp; Construction Award 2025 (MA000020)? Learn which engagement type fits, avoid costly Fair Work mistakes, and stay compliant.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/\" \/>\n<meta property=\"og:site_name\" content=\"Workstem Australia\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-26T01:07:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-27T01:20:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1050\" \/>\n\t<meta property=\"og:image:height\" content=\"490\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Brandon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Brandon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/\"},\"author\":{\"name\":\"Brandon\",\"@id\":\"https:\/\/www.workstem.com\/au\/#\/schema\/person\/5a64ac285d53290c84d0a3a52429d56e\"},\"headline\":\"Daily vs Weekly vs Casual Employment in Building and Construction Award (MA000020)\",\"datePublished\":\"2025-07-26T01:07:29+00:00\",\"dateModified\":\"2025-08-27T01:20:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/\"},\"wordCount\":898,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png\",\"keywords\":[\"Award Interpretation\",\"Casual\",\"Popular\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/\",\"url\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/\",\"name\":\"Construction Award 2025: Daily vs Weekly vs Casual- Workstem Australia\",\"isPartOf\":{\"@id\":\"https:\/\/www.workstem.com\/au\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png\",\"datePublished\":\"2025-07-26T01:07:29+00:00\",\"dateModified\":\"2025-08-27T01:20:09+00:00\",\"author\":{\"@id\":\"https:\/\/www.workstem.com\/au\/#\/schema\/person\/5a64ac285d53290c84d0a3a52429d56e\"},\"description\":\"Confused about daily vs weekly vs casual under the Building & Construction Award 2025 (MA000020)? Learn which engagement type fits, avoid costly Fair Work mistakes, and stay compliant.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#primaryimage\",\"url\":\"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png\",\"contentUrl\":\"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png\",\"width\":1050,\"height\":490,\"caption\":\"Confused about daily vs weekly vs casual under the Building & Construction Award 2025 (MA000020)? Learn which engagement type fits, avoid costly Fair Work mistakes, and stay compliant.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.workstem.com\/au\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Daily vs Weekly vs Casual Employment in Building and Construction Award (MA000020)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.workstem.com\/au\/#website\",\"url\":\"https:\/\/www.workstem.com\/au\/\",\"name\":\"Workstem Australia\",\"description\":\"Human Resources Management HRM System Australia\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.workstem.com\/au\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.workstem.com\/au\/#\/schema\/person\/5a64ac285d53290c84d0a3a52429d56e\",\"name\":\"Brandon\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Award 2025: Daily vs Weekly vs Casual- Workstem Australia","description":"Confused about daily vs weekly vs casual under the Building & Construction Award 2025 (MA000020)? Learn which engagement type fits, avoid costly Fair Work mistakes, and stay compliant.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/","og_locale":"en_US","og_type":"article","og_title":"Construction Award 2025: Daily vs Weekly vs Casual- Workstem Australia","og_description":"Confused about daily vs weekly vs casual under the Building & Construction Award 2025 (MA000020)? Learn which engagement type fits, avoid costly Fair Work mistakes, and stay compliant.","og_url":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/","og_site_name":"Workstem Australia","article_published_time":"2025-07-26T01:07:29+00:00","article_modified_time":"2025-08-27T01:20:09+00:00","og_image":[{"width":1050,"height":490,"url":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png","type":"image\/png"}],"author":"Brandon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Brandon","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#article","isPartOf":{"@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/"},"author":{"name":"Brandon","@id":"https:\/\/www.workstem.com\/au\/#\/schema\/person\/5a64ac285d53290c84d0a3a52429d56e"},"headline":"Daily vs Weekly vs Casual Employment in Building and Construction Award (MA000020)","datePublished":"2025-07-26T01:07:29+00:00","dateModified":"2025-08-27T01:20:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/"},"wordCount":898,"commentCount":0,"image":{"@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#primaryimage"},"thumbnailUrl":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png","keywords":["Award Interpretation","Casual","Popular"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/","url":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/","name":"Construction Award 2025: Daily vs Weekly vs Casual- Workstem Australia","isPartOf":{"@id":"https:\/\/www.workstem.com\/au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#primaryimage"},"image":{"@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#primaryimage"},"thumbnailUrl":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png","datePublished":"2025-07-26T01:07:29+00:00","dateModified":"2025-08-27T01:20:09+00:00","author":{"@id":"https:\/\/www.workstem.com\/au\/#\/schema\/person\/5a64ac285d53290c84d0a3a52429d56e"},"description":"Confused about daily vs weekly vs casual under the Building & Construction Award 2025 (MA000020)? Learn which engagement type fits, avoid costly Fair Work mistakes, and stay compliant.","breadcrumb":{"@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#primaryimage","url":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png","contentUrl":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2025\/07\/Top-3-MA000020-Compliance-Mistakes-That-Cost-100k-3-min-1.png","width":1050,"height":490,"caption":"Confused about daily vs weekly vs casual under the Building & Construction Award 2025 (MA000020)? Learn which engagement type fits, avoid costly Fair Work mistakes, and stay compliant."},{"@type":"BreadcrumbList","@id":"https:\/\/www.workstem.com\/au\/blog\/daily-vs-weekly-vs-casual-employment-in-building-and-construction-award-ma000020\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.workstem.com\/au\/"},{"@type":"ListItem","position":2,"name":"Daily vs Weekly vs Casual Employment in Building and Construction Award (MA000020)"}]},{"@type":"WebSite","@id":"https:\/\/www.workstem.com\/au\/#website","url":"https:\/\/www.workstem.com\/au\/","name":"Workstem Australia","description":"Human Resources Management HRM System Australia","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.workstem.com\/au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.workstem.com\/au\/#\/schema\/person\/5a64ac285d53290c84d0a3a52429d56e","name":"Brandon"}]}},"_links":{"self":[{"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/posts\/2077","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/comments?post=2077"}],"version-history":[{"count":3,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/posts\/2077\/revisions"}],"predecessor-version":[{"id":2268,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/posts\/2077\/revisions\/2268"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/media\/2267"}],"wp:attachment":[{"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/media?parent=2077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/categories?post=2077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/tags?post=2077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}