{"id":3199,"date":"2026-09-08T23:23:31","date_gmt":"2026-09-08T11:23:31","guid":{"rendered":"https:\/\/www.workstem.com\/au\/blog\/auto-draft\/"},"modified":"2026-09-08T23:24:42","modified_gmt":"2026-09-08T11:24:42","slug":"au-blog-construction-payroll-compliance-overtime-rdo-labour-costs","status":"publish","type":"post","link":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/","title":{"rendered":"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs"},"content":{"rendered":"<div class='post-index' id='post-index'><a href='###' id='post-index-close'><i class='fa fa-list'><\/i><\/a>\r\n\t\t\t\t<h3 class='post-index-title'>Table of content<\/h3>\r\n\t\t\t\t<div class='post-index-inner' id='post-index-inner'>\r\n\t\t\t\t<ol class='post-index-list'><li class=\"post-index-item\" data-tt=\"title-idx-0\" ><a href=\"###\"title=\"Why is construction payroll so difficult to manage?\">Why is construction payroll so difficult to manage?<\/a><\/li><li class=\"post-index-item\" data-tt=\"title-idx-1\" ><a href=\"###\"title=\"What is the biggest challenge faced under construction payroll?\">What is the biggest challenge faced under construction payroll?<\/a><\/li><li class=\"post-index-item\" data-tt=\"title-idx-2\" ><a href=\"###\"title=\"Workstem&#8217;s construction payroll workflow\">Workstem&#8217;s construction payroll workflow<\/a><\/li><li class=\"post-index-item\" data-tt=\"title-idx-3\" ><a href=\"###\"title=\"What construction payroll should look like?\">What construction payroll should look like?<\/a><\/li><li class=\"post-index-item\" data-tt=\"title-idx-4\" ><a href=\"###\"title=\"A construction payroll compliance checklist\">A construction payroll compliance checklist<\/a><\/li><li class=\"post-index-item\" data-tt=\"title-idx-5\" ><a href=\"###\"title=\"Why should construction businesses connect payroll and workforce management?\">Why should construction businesses connect payroll and workforce management?<\/a><\/li><li class=\"post-index-item\" data-tt=\"title-idx-6\" ><a href=\"###\"title=\"FAQs about the Construction industry\">FAQs about the Construction industry<\/a><\/li><li class=\"post-index-item\" data-tt=\"title-idx-7\" ><a href=\"###\"title=\"Read more\">Read more<\/a><\/li><\/ol>\r\n\t\t\t<\/div><\/div>\r\n\t\t\t<script>\r\n\t\t\t$(function(){\r\n\t\t\t\tvar contIdxHeight = $('#post-index-inner').height()+20;\r\n\t\t\t\t$('#post-index-inner').css('height',contIdxHeight+'px');\r\n\t\t\t\t$('#post-index-close').on('click',function(){\r\n\t\t\t\t\tif($('#post-index-inner').height()>20) {\r\n\t\t\t\t\t\t$('#post-index-inner').css('height',0);\r\n\t\t\t\t\t\t$('#post-index-inner').css('padding-top',0);\r\n\t\t\t\t\t} else {\r\n\t\t\t\t\t\t$('#post-index-inner').css('height',contIdxHeight+'px');\r\n\t\t\t\t\t\t$('#post-index-inner').css('padding-top','20px');\r\n\t\t\t\t\t}\r\n\t\t\t\t});\r\n\t\t\t\t$('.post-index-item').on('click',function(){\r\n\t\t\t\t\tvar tt=$(this).data('tt');\r\n\t\t\t\t\tscrollPosition(document.getElementById(tt));\r\n\t\t\t\t});\r\n\t\t\t});\t\r\n\t\t\t<\/script><div class='post-content-full'><p>Construction payroll in Australia is rarely just a matter of multiplying hours by an hourly rate.<\/p>\n<p>For businesses covered by the <span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/building-construction-award-rates-2026-2027\/\">Building and Construction General On-site Award 2020 (MA000020)<\/a><\/span>, payroll can involve classifications, overtime, allowances, penalty rates, <span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/glossary\/rostered-day-off\/\">Rostered Days Off (RDOs)<\/a><\/span>, leave loading and other conditions that need to be applied correctly.<\/p>\n<p>The problem becomes harder when employees work across different projects, locations and shifts.<\/p>\n<p>A worker may be rostered for one project, work additional hours on another, accumulate overtime and then have those hours flow into payroll through a separate timesheet or spreadsheet.<\/p>\n<p>By payday, payroll may be accurate only if someone has successfully reconciled all of those moving parts.<\/p>\n<p>That is why construction payroll compliance should not start at the payroll screen.<\/p>\n<p>It should start with how work is scheduled and recorded.<\/p>\n<p><em><strong>Roster \u2192 Attendance \u2192 Overtime \u2192 Award rules \u2192 Payroll \u2192 Project cost<\/strong><\/em><\/p>\n<p>When those stages are disconnected, payroll errors become much easier to create and much harder to find.<\/p>\n<p>Workstem brings rostering, attendance, award interpretation and payroll together, with automated calculations for overtime, allowances, loadings and leave.<\/p>\n<h2 id=\"title-idx-0\" class=\"icon-anchor\">Why is construction payroll so difficult to manage?<\/h2>\n<p>The Building and Construction General On-site Award covers eligible employees working in Australia&#8217;s building and construction industry and contains specific rules around pay and conditions. Fair Work&#8217;s current guidance references clauses covering ordinary hours, overtime, allowances, annual leave and other conditions.<\/p>\n<p>The complexity comes from the interaction between these rules.<\/p>\n<p>A payroll team may need to determine:<\/p>\n<ul>\n<li>Which award and classification applies?<\/li>\n<li>What is the employee&#8217;s ordinary rate?<\/li>\n<li>How many ordinary hours were worked?<\/li>\n<li>Which hours qualify as overtime?<\/li>\n<li>Was the work performed on a Saturday, Sunday or public holiday?<\/li>\n<li>Are allowances payable?<\/li>\n<li>Has an RDO been accrued?<\/li>\n<li>Is annual leave loading applicable?<\/li>\n<li>Has the employee worked across multiple projects?<\/li>\n<li>Does the employee&#8217;s actual attendance match the roster?<\/li>\n<li>Has the applicable award rate changed?<\/li>\n<\/ul>\n<p>A spreadsheet can store the answers.<\/p>\n<p>It cannot reliably make sure every answer remains consistent as circumstances change.<\/p>\n<h2 id=\"title-idx-1\" class=\"icon-anchor\">What is the biggest challenge faced under construction payroll?<\/h2>\n<p>Consider a simple scenario.<\/p>\n<p>A construction worker is scheduled:<\/p>\n<p><strong>Monday\u2013Friday<\/strong><br \/>\n<strong>7:00 am\u20133:30 pm<\/strong><br \/>\n<strong>Project A<\/strong><\/p>\n<p>On Wednesday, the site falls behind schedule.<\/p>\n<p>The supervisor asks the employee to stay until 6:00 pm.<\/p>\n<p>Now the original roster and actual attendance are different.<\/p>\n<p>If the additional hours are recorded manually, the payroll team needs to determine:<\/p>\n<ol>\n<li>What time the employee actually worked.<\/li>\n<li>Whether those additional hours qualify as overtime.<\/li>\n<li>What rate applies.<\/li>\n<li>Whether other conditions affect the calculation.<\/li>\n<li>Which project should carry the additional labour cost.<\/li>\n<\/ol>\n<p>The employee may ultimately be paid correctly.<\/p>\n<p>But getting there through manual reconciliation creates unnecessary administrative work and introduces another opportunity for error.<\/p>\n<h3>A better workflow<\/h3>\n<table>\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><strong>Stage<\/strong><\/td>\n<td style=\"text-align: center;\"><strong>Question<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Roster<\/td>\n<td style=\"text-align: center;\">What was the employee scheduled to work?<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Attendance<\/td>\n<td style=\"text-align: center;\">What did they actually work?<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Variance<\/td>\n<td style=\"text-align: center;\">Where did actual hours differ?<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Rules<\/td>\n<td style=\"text-align: center;\">What payroll conditions apply?<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Payroll<\/td>\n<td style=\"text-align: center;\">What should the employee be paid?<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Project<\/td>\n<td style=\"text-align: center;\">Which project carries the labour cost?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>This is why integrating rostering and attendance is so important.<\/p>\n<p>Workstem states that scheduled rosters can be compared with actual attendance, while attendance data can flow into payroll without manual import\/export processes.<\/p>\n<h3>1. Overtime is a scheduling problem before it becomes a payroll problem<\/h3>\n<p>Many businesses treat overtime as something payroll calculates at the end of the pay cycle.<\/p>\n<p>That is too late for effective labour-cost control.<\/p>\n<p>Suppose a project has 20 workers scheduled for eight hours.<\/p>\n<p>The planned labour requirement is:<\/p>\n<p><em><strong>20 \u00d7 8 = 160 hours<\/strong><\/em><\/p>\n<p>If the workforce actually works an additional two hours each:<\/p>\n<p><em><strong>20 \u00d7 10 = 200 hours<\/strong><\/em><\/p>\n<p>That creates:<\/p>\n<p><em><strong>40 additional labour hours<\/strong><\/em><\/p>\n<p>The payroll team needs to calculate those hours.<\/p>\n<p>But the project manager needs to know why those 40 hours happened.<\/p>\n<p>Was it:<\/p>\n<ul>\n<li>A genuine project delay?<\/li>\n<li>Poor workforce planning?<\/li>\n<li>Understaffing?<\/li>\n<li>A scheduling change?<\/li>\n<li>An unexpected site requirement?<\/li>\n<li>A supervisor-approved extension?<\/li>\n<\/ul>\n<p>Payroll tells you what you owe.<\/p>\n<p>Workforce scheduling helps explain why you owe it.<\/p>\n<p>Workstem&#8217;s rostering platform supports projected labour-cost visibility before rosters are published, while its attendance system tracks overtime hours and synchronises attendance with payroll.<\/p>\n<p><a href=\"https:\/\/www.workstem.com\/au\/product\/rostering\/\"><span style=\"color: #3366ff;\">See how to roster your construction workforce <\/span><em><strong><span style=\"color: #3366ff;\">\u2192<\/span> <\/strong><\/em><\/a><\/p>\n<h3>2. RDO management requires accurate working-hour records<\/h3>\n<p>Rostered Days Off can add another layer of complexity to construction workforce management.<\/p>\n<p>An RDO arrangement depends on accurately tracking working hours over time.<\/p>\n<p>If employees are working different hours across projects and sites, manually maintaining RDO balances can become difficult.<\/p>\n<p>A system needs to distinguish between:<\/p>\n<p><em><strong>Scheduled hours \u2192 Actual hours \u2192 Overtime \u2192 RDO accumulation \u2192 RDO taken<\/strong><\/em><\/p>\n<p>Workstem&#8217;s Australian scheduling product includes automatic summaries for RDOs, public holidays and overtime hours.<\/p>\n<p>This is important because RDO information should not exist separately from the employee&#8217;s actual attendance.<\/p>\n<p>If the underlying hours are wrong, the downstream balance can also be wrong.<\/p>\n<h3>3. Award rates changes<\/h3>\n<p>Australian award rates are not permanently fixed.<\/p>\n<p>Fair Work confirms that minimum award wages increased from 1 July 2026 following the Annual Wage Review 2026. Employers need to use the updated rates and pay guides when checking employee pay.<\/p>\n<p>For construction businesses, that means an annual rate update cannot simply be treated as an accounting administration task.<\/p>\n<p>It can affect:<\/p>\n<ul>\n<li>ordinary hourly rates<\/li>\n<li>overtime calculations<\/li>\n<li>allowances<\/li>\n<li>apprentice rates<\/li>\n<li>penalty rates<\/li>\n<li>project labour budgets<\/li>\n<li>payroll forecasts<\/li>\n<\/ul>\n<p>A rate change can therefore affect both employee pay and project costing.<\/p>\n<p>Workstem&#8217;s Australian payroll platform states that award rates are updated through its Fair Work API integration and that payroll can automatically calculate overtime, loadings, allowances and leave.<\/p>\n<p><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/product\/award-interpretation\/\">See how we interpret awards under Building &amp; Construction Awards <em><strong> \u2192 <\/strong><\/em><\/a><\/span><\/p>\n<h3>4. Construction payroll errors often come from disconnected systems<\/h3>\n<p>Imagine a business using four separate tools:<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><strong>Function<\/strong><\/td>\n<td style=\"text-align: center;\"><strong>System<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Roster<\/td>\n<td style=\"text-align: center;\">Excel<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Attendance<\/td>\n<td style=\"text-align: center;\">Clock-in device<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Project allocation<\/td>\n<td style=\"text-align: center;\">Project spreadsheet<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Payroll<\/td>\n<td style=\"text-align: center;\">Payroll software<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Each system may work perfectly on its own.<\/p>\n<p>The problem is the handover.<\/p>\n<p>Before calculating pay, the payroll team may need to cross-check Excel rosters, attendance records, project allocations and approved overtime.<\/p>\n<p>Every manual transfer creates another opportunity for:<\/p>\n<ul>\n<li>missing hours<\/li>\n<li>duplicated hours<\/li>\n<li>wrong project allocation<\/li>\n<li>incorrect overtime<\/li>\n<li>outdated employee information<\/li>\n<li>payroll corrections<\/li>\n<\/ul>\n<p>Workstem&#8217;s model is different: rostering, attendance, award interpretation and payroll sit within the same platform.<\/p>\n<h3>5. Project-specific labour rates need to be controlled<\/h3>\n<p>Construction businesses may need to calculate labour differently depending on the project or job.<\/p>\n<p>Workstem&#8217;s Project\/Job Pro allows businesses to create project\/job categories, define hourly rates and set minimum and maximum hourly-rate limits. It can also track expected and actual attendance hours against project\/job records.<\/p>\n<p>This creates a useful control layer.<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><strong>Project<\/strong><\/td>\n<td style=\"text-align: center;\"><strong>Minimum rate<\/strong><\/td>\n<td style=\"text-align: center;\"><strong>Maximum rate<\/strong><\/td>\n<td style=\"text-align: center;\"><strong>Scheduled rate<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Project A<\/td>\n<td style=\"text-align: center;\">$42<\/td>\n<td style=\"text-align: center;\">$48<\/td>\n<td style=\"text-align: center;\">$45<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Project B<\/td>\n<td style=\"text-align: center;\">$45<\/td>\n<td style=\"text-align: center;\">$52<\/td>\n<td style=\"text-align: center;\">$50<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Project C<\/td>\n<td style=\"text-align: center;\">$50<\/td>\n<td style=\"text-align: center;\">$60<\/td>\n<td style=\"text-align: center;\">$55<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The point is not simply to store different rates.<\/p>\n<p>It is to reduce the likelihood of assigning a rate outside the parameters established for the job.<\/p>\n<h3>6. Roster &amp; payroll should be in sync<\/h3>\n<p>A construction payroll system should not force payroll administrators to reconstruct the month from separate records.<\/p>\n<p>The ideal workflow is:<\/p>\n<h4>Before work<\/h4>\n<p>Project requirement<\/p>\n<p>\u2193<\/p>\n<p>Required workforce<\/p>\n<p>\u2193<\/p>\n<p>Roster<\/p>\n<p>\u2193<\/p>\n<p>Projected labour cost<\/p>\n<h4>During work<\/h4>\n<p>Employee clocks in\/out<\/p>\n<p>\u2193<\/p>\n<p>Actual attendance<\/p>\n<p>\u2193<\/p>\n<p>Overtime \/ variance<\/p>\n<h3>After work<\/h3>\n<p>Payroll calculation<\/p>\n<p>\u2193<\/p>\n<p>Project labour hours<\/p>\n<p>\u2193<\/p>\n<p>Cost analysis<\/p>\n<p>This creates a traceable relationship between the original plan and the final payroll.<\/p>\n<h2 id=\"title-idx-2\" class=\"icon-anchor\">Workstem&#8217;s construction payroll workflow<\/h2>\n<p>Workstem combines several controls that are normally separated.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3201 size-full\" src=\"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/payroll-workflow.avif\" alt=\"\" width=\"1774\" height=\"887\" srcset=\"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/payroll-workflow.avif 1774w, https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/payroll-workflow-300x150.avif 300w, https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/payroll-workflow-1024x512.avif 1024w, https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/payroll-workflow-768x384.avif 768w, https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/payroll-workflow-1536x768.avif 1536w, https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/payroll-workflow-624x312.avif 624w\" sizes=\"auto, (max-width: 1774px) 100vw, 1774px\" \/><\/p>\n<h2 id=\"title-idx-3\" class=\"icon-anchor\">What construction payroll should look like?<\/h2>\n<table>\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><strong>Requirements<\/strong><\/td>\n<td style=\"text-align: center;\"><strong style=\"font-family: inherit; font-size: inherit;\">Disconnected process<\/strong><\/td>\n<td style=\"text-align: center;\"><strong>Connected process<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Roster<\/td>\n<td style=\"text-align: center;\">Spreadsheet<\/td>\n<td style=\"text-align: center;\">Digital roster<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Actual hours<\/td>\n<td style=\"text-align: center;\">Separate timesheet<\/td>\n<td style=\"text-align: center;\">Integrated attendance<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Overtime<\/td>\n<td style=\"text-align: center;\">Manually reconcile<\/td>\n<td style=\"text-align: center;\">Automatically captured\/calculated<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">RDO<\/td>\n<td style=\"text-align: center;\">Separate tracking<\/td>\n<td style=\"text-align: center;\">Roster\/attendance data<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Project allocation<\/td>\n<td style=\"text-align: center;\">Manual coding<\/td>\n<td style=\"text-align: center;\">Project\/job assignment<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Labour rate<\/td>\n<td style=\"text-align: center;\">Manually checked<\/td>\n<td style=\"text-align: center;\">Project rate controls<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Payroll<\/td>\n<td style=\"text-align: center;\">Data re-entry<\/td>\n<td style=\"text-align: center;\">Attendance \u2192 payroll<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Labour cost<\/td>\n<td style=\"text-align: center;\">After-the-fact<\/td>\n<td style=\"text-align: center;\">Planned + actual visibility<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The objective is not simply faster payroll.<\/p>\n<p>It is more reliable payroll with better visibility over the labour generating the cost.<\/p>\n<h2 id=\"title-idx-4\" class=\"icon-anchor\">A construction payroll compliance checklist<\/h2>\n<p>Before choosing construction payroll software, ask:<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"text-align: center;\"><strong>Question<\/strong><\/td>\n<td style=\"text-align: center;\"><strong style=\"font-family: inherit; font-size: inherit;\">Why it matters<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can the system track actual attendance?<\/td>\n<td style=\"text-align: center;\">Payroll should be based on reliable hours<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can it calculate overtime?<\/td>\n<td style=\"text-align: center;\">Manual overtime creates error risk<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can it handle allowances and loadings?<\/td>\n<td style=\"text-align: center;\">Construction pay can contain multiple components<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can it manage RDO information?<\/td>\n<td style=\"text-align: center;\">RDO arrangements depend on accurate hour tracking<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can it apply current award rates?<\/td>\n<td style=\"text-align: center;\">Award rates change<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can workers be assigned to projects?<\/td>\n<td style=\"text-align: center;\">Labour costs need attribution<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can project-specific rates be controlled?<\/td>\n<td style=\"text-align: center;\">Reduces incorrect rate assignments<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can supervisors update rosters remotely?<\/td>\n<td style=\"text-align: center;\">Construction work happens in the field<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can attendance flow into payroll?<\/td>\n<td style=\"text-align: center;\">Reduces manual reconciliation<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\">Can payroll data be traced back to attendance?<\/td>\n<td style=\"text-align: center;\">Makes corrections and audits easier<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"title-idx-5\" class=\"icon-anchor\">Why should construction businesses connect payroll and workforce management?<\/h2>\n<p>Payroll accuracy does not begin with the pay run.<\/p>\n<p>It begins with the quality of the workforce data entering the pay run.<\/p>\n<p>If the roster is inaccurate, attendance is incomplete, project allocation is missing and overtime is manually entered, payroll has to fix problems that were created earlier in the process.<\/p>\n<p>A better model is:<\/p>\n<p>Plan \u2192 Schedule \u2192 Capture \u2192 Validate \u2192 Calculate \u2192 Report<\/p>\n<p>That is the fundamental shift from payroll administration to workforce-driven payroll management.<\/p>\n<h2 id=\"title-idx-6\" class=\"icon-anchor\">FAQs about the Construction industry<\/h2>\n<p><strong>Q1: What payroll software is best for construction businesses in Australia?<\/strong><\/p>\n<p>A1; The right construction payroll software should handle more than basic wage calculations. It should support relevant award conditions, overtime, allowances, attendance, project allocation and payroll reporting while reducing manual reconciliation. Workstem combines rostering, attendance, award interpretation and payroll in one platform and supports project\/job-based labour management.<\/p>\n<p><strong>Q2: How can construction companies reduce payroll errors?<\/strong><\/p>\n<p>A2: The strongest approach is to reduce manual data transfers between rostering, attendance and payroll. Actual attendance should be captured digitally, overtime should be identified systematically and payroll should use the verified attendance data. <span style=\"font-size: 1rem;\">Workstem synchronises attendance with payroll and provides automated calculations for overtime, allowances, loadings and leave.<\/span><\/p>\n<p><strong>Q3: How is overtime calculated under the Building and Construction Award?<\/strong><\/p>\n<p><span style=\"font-size: 1rem;\">A3: The answer depends on the employee&#8217;s classification, working pattern and the specific award provisions that apply. Construction businesses should refer to the current Building and Construction General On-site Award and Fair Work pay guides rather than relying on a generic overtime formula. Fair Work&#8217;s current construction guidance identifies the relevant award provisions covering pay and overtime.<\/span><\/p>\n<p><strong>Q4: Can construction payroll software manage RDOs?<\/strong><\/p>\n<p>A4: Yes, but the important issue is whether the system can accurately track the working hours from which RDO arrangements are managed. <span style=\"font-size: 1rem;\">Workstem&#8217;s Australian rostering product includes automatic summaries for RDOs, public holidays and overtime hours.<\/span><\/p>\n<p><strong>Q5. How can construction businesses track labour costs by project?<\/strong><\/p>\n<p>A5: Businesses should assign workers&#8217; scheduled shifts and actual hours to the relevant project or job. This creates a link between workforce activity and project labour expenditure. Workstem&#8217;s Project\/Job Pro supports project\/job categories, project-specific hourly-rate controls and expected versus actual attendance hours.<\/p>\n<p><strong>Q6: How does integrated rostering improve construction payroll?<\/strong><\/p>\n<p>A6: Integrated rostering gives payroll access to the information that explains why an employee was paid a particular amount. Instead of starting with a payroll figure and working backwards, the business can follow: <strong>Roster \u2192 Attendance \u2192 Overtime \u2192 Payroll \u2192 Project cost. <\/strong>That creates better traceability and reduces manual reconciliation.<\/p>\n<h1>To Wrap Up<\/h1>\n<p>Construction payroll compliance is calculating wages correctly and also making sure the information flowing through to payroll is accurate, complete and traceable.<\/p>\n<p>When construction businesses connect:<\/p>\n<p>Roster + Attendance + Award Rules + Project + Payroll<\/p>\n<p>they gain better control over both employee pay and project labour costs.<\/p>\n<p>Workstem brings these functions together, combining rostering, attendance, award interpretation, project\/job management and payroll in one platform.<\/p>\n<p>Book a Workstem demo to see how integrated rostering, attendance and payroll can simplify construction workforce management.<\/p>\n<h2 id=\"title-idx-7\" class=\"icon-anchor\">Read more<\/h2>\n<h3 class=\"page-title\">Construction Payroll &amp; Insights<\/h3>\n<header class=\"entry-header\">\n<p class=\"page-title\"><em><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/best-construction-payroll-software-2025\/\">Best Construction Payroll Software\u00a0<\/a><\/span><\/em><\/p>\n<p class=\"page-title\"><em><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/fair-work-penalties-unpaid-wages-construction\/\">How to Avoid Fair Work Penalties for Unpaid Wages in Construction<\/a><\/span><\/em><\/p>\n<header class=\"entry-header\">\n<p class=\"page-title\"><span style=\"color: #3366ff;\"><em><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/payroll-compliance-construction-fair-work-cases-learned\/\">Payroll compliance in construction: Cases from Fair Work learned<\/a><\/em><\/span><\/p>\n<p class=\"page-title\"><span style=\"color: #3366ff;\"><em><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/australian-construction-workforce-scheduling-labour-costs-management\/\">Australian Construction: Multi-Site Labour Costs Management<\/a><\/em><\/span><\/p>\n<\/header>\n<h3>Other award related articles<\/h3>\n<p class=\"page-title\"><span style=\"color: #3366ff;\"><em><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/glossary\/building-construction-award\/\">Building and Construction Award<\/a><\/em><\/span><\/p>\n<p class=\"page-title\"><em><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/building-construction-award-rates-2026-2027\/\">Building &amp; Construction Award (MA000020) Pay Rates 2026\/27<\/a><\/span><\/em><\/p>\n<p class=\"page-title\"><span style=\"color: #3366ff;\"><em><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/building-construction-award-ma000020-2025-guide\/\">Building &amp; Construction Award [MA000020] 2025: Pay Rates &amp; Rights<\/a><\/em><\/span><\/p>\n<p class=\"page-title\"><em><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/www.workstem.com\/au\/blog\/simplify-payroll-award-interpretation-software\/\">Simplify Payroll with an Award Interpretation Software<\/a><\/span><\/em><\/p>\n<\/header>\n<p>&nbsp;<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Table of content Why is construction payroll so difficult to manage?What is the biggest challenge faced under construction payroll?Workstem&#8217;s construction payroll workflowWhat construction payroll should look like?A construction payroll compliance checklistWhy should construction businesses connect payroll and workforce management?FAQs about the Construction industryRead more Construction payroll in Australia is rarely just a matter of multiplying&#8230;<\/p>\n","protected":false},"author":16,"featured_media":3213,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[40,46],"class_list":["post-3199","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-award-interpretation","tag-payroll"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs - Workstem Australia<\/title>\n<meta name=\"description\" content=\"See how to manage construction payroll, overtime, RDOs and award compliance while improving labour cost visibility across Australian projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs - Workstem Australia\" \/>\n<meta property=\"og:description\" content=\"See how to manage construction payroll, overtime, RDOs and award compliance while improving labour cost visibility across Australian projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/\" \/>\n<meta property=\"og:site_name\" content=\"Workstem Australia\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-08T11:23:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-08T11:24:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/cover-09-construction-overtime-rdos.avif\" \/>\n\t<meta property=\"og:image:width\" content=\"1050\" \/>\n\t<meta property=\"og:image:height\" content=\"490\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Brandon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Brandon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/\"},\"author\":{\"name\":\"Brandon\",\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/#\\\/schema\\\/person\\\/5a64ac285d53290c84d0a3a52429d56e\"},\"headline\":\"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs\",\"datePublished\":\"2026-09-08T11:23:31+00:00\",\"dateModified\":\"2026-09-08T11:24:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/\"},\"wordCount\":1969,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/09\\\/cover-09-construction-overtime-rdos.avif\",\"keywords\":[\"Award Interpretation\",\"Payroll\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/\",\"url\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/\",\"name\":\"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs - Workstem Australia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/09\\\/cover-09-construction-overtime-rdos.avif\",\"datePublished\":\"2026-09-08T11:23:31+00:00\",\"dateModified\":\"2026-09-08T11:24:42+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/#\\\/schema\\\/person\\\/5a64ac285d53290c84d0a3a52429d56e\"},\"description\":\"See how to manage construction payroll, overtime, RDOs and award compliance while improving labour cost visibility across Australian projects.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/09\\\/cover-09-construction-overtime-rdos.avif\",\"contentUrl\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/09\\\/cover-09-construction-overtime-rdos.avif\",\"width\":1050,\"height\":490,\"caption\":\"See how to manage construction payroll, overtime, RDOs and award compliance while improving labour cost visibility across Australian projects.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/blog\\\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/#website\",\"url\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/\",\"name\":\"Workstem Australia\",\"description\":\"Human Resources Management HRM System Australia\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.workstem.com\\\/au\\\/#\\\/schema\\\/person\\\/5a64ac285d53290c84d0a3a52429d56e\",\"name\":\"Brandon\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs - Workstem Australia","description":"See how to manage construction payroll, overtime, RDOs and award compliance while improving labour cost visibility across Australian projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/","og_locale":"en_US","og_type":"article","og_title":"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs - Workstem Australia","og_description":"See how to manage construction payroll, overtime, RDOs and award compliance while improving labour cost visibility across Australian projects.","og_url":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/","og_site_name":"Workstem Australia","article_published_time":"2026-09-08T11:23:31+00:00","article_modified_time":"2026-09-08T11:24:42+00:00","og_image":[{"width":1050,"height":490,"url":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/cover-09-construction-overtime-rdos.avif","type":"image\/png"}],"author":"Brandon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Brandon","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/#article","isPartOf":{"@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/"},"author":{"name":"Brandon","@id":"https:\/\/www.workstem.com\/au\/#\/schema\/person\/5a64ac285d53290c84d0a3a52429d56e"},"headline":"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs","datePublished":"2026-09-08T11:23:31+00:00","dateModified":"2026-09-08T11:24:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/"},"wordCount":1969,"commentCount":0,"image":{"@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/#primaryimage"},"thumbnailUrl":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/cover-09-construction-overtime-rdos.avif","keywords":["Award Interpretation","Payroll"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/","url":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/","name":"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs - Workstem Australia","isPartOf":{"@id":"https:\/\/www.workstem.com\/au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/#primaryimage"},"image":{"@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/#primaryimage"},"thumbnailUrl":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/cover-09-construction-overtime-rdos.avif","datePublished":"2026-09-08T11:23:31+00:00","dateModified":"2026-09-08T11:24:42+00:00","author":{"@id":"https:\/\/www.workstem.com\/au\/#\/schema\/person\/5a64ac285d53290c84d0a3a52429d56e"},"description":"See how to manage construction payroll, overtime, RDOs and award compliance while improving labour cost visibility across Australian projects.","breadcrumb":{"@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/#primaryimage","url":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/cover-09-construction-overtime-rdos.avif","contentUrl":"https:\/\/www.workstem.com\/au\/wp-content\/uploads\/sites\/7\/2026\/09\/cover-09-construction-overtime-rdos.avif","width":1050,"height":490,"caption":"See how to manage construction payroll, overtime, RDOs and award compliance while improving labour cost visibility across Australian projects."},{"@type":"BreadcrumbList","@id":"https:\/\/www.workstem.com\/au\/blog\/au-blog-construction-payroll-compliance-overtime-rdo-labour-costs\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.workstem.com\/au\/"},{"@type":"ListItem","position":2,"name":"Construction Payroll Compliance Australia: Overtime, RDOs &amp; Labour Costs"}]},{"@type":"WebSite","@id":"https:\/\/www.workstem.com\/au\/#website","url":"https:\/\/www.workstem.com\/au\/","name":"Workstem Australia","description":"Human Resources Management HRM System Australia","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.workstem.com\/au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.workstem.com\/au\/#\/schema\/person\/5a64ac285d53290c84d0a3a52429d56e","name":"Brandon"}]}},"_links":{"self":[{"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/posts\/3199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/comments?post=3199"}],"version-history":[{"count":3,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/posts\/3199\/revisions"}],"predecessor-version":[{"id":3214,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/posts\/3199\/revisions\/3214"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/media\/3213"}],"wp:attachment":[{"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/media?parent=3199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/categories?post=3199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.workstem.com\/au\/wp-json\/wp\/v2\/tags?post=3199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}